Comments to DEC/ACOE Permit on groundwater withdrawal discharged to Harlem River

January 11th, 2022 Posted in Environmental Justice Issues, Environmental Reviews, Front Page News, Mott Haven, Permits, Permits Comments and locations, Projects

BCEQ asks for a complete and thorough Environmental Review from the NYSDEC and the US Army Corp of Engineers.

The applicant proposes to install and operate a temporary construction dewatering system with a proposed maximum withdrawal of 360,000 gallons per day to facilitate the construction of a new multi-story building. Pumped groundwater is to be directed to an existing combined sewer located in East 135th Street between Rider and 3rd Avenues which discharges to NYCDEP’s Wards Island WRRF.

BCEQ Comments on DEC Groundwater Withdrawal Permit 01.06.202 FINAL 

Share Button




Related Posts:

Sorry, comments for this entry are closed at this time.