Comments on CSO and Green Infrastructure 11.18.11

November 18th, 2011 Posted in Bronx River, Environmental Reviews, Front Page News, Harlem River Working Group, Low Impact Development, Projects, Water Committee
Here is some of what we submitted:

Green Infrastructure (GI) has to be incorporated into the Long Term Control Plans in a meaning and measurablemanner. While this plan goes a long way toward that goal, there is no need for additional planning for incorporation of GIwhile the Long Term Control Plans (LTCPs) are being developed. Just do it; it is already widely accepted all over thecountry and by EPA.

Read more here

BCEQ_letter_CSO2011 111811

Share Button




Related Posts:

Sorry, comments for this entry are closed at this time.