NYC CSO 101 Bronx Research Documents
November 13th, 2018 Posted in Amalgamated Green Study, Harlem River Long Term Control Plan, Living Ecological Green Infrastructure, Low Impact Development, Pier 5 Pop Up Wetland - first of its kind, Projects, Putnam Rail Trail, sustainable parks, Van Cortlandt Park, Water CommitteeThe following is an ongoing collection of documents for students and/or media reporters to use.
Tibbetts Brook Daylighting Presentation- for Speak Up 082919
Harlem River CSO Vol and Events 2006
Rivers, Hill, Valley, Park & Heights CB 8 January 2015 short revised 091116
Stormwater GI 11.4.15 CB8 BCEQ
Van Cortlandt Village Tour 9-25-17 report
Draft ACTION Plan CB8&S 062915
Long awaited meeting on LTCP June 2012
THE WAIT PROGRAM!
http://www.nyc.gov/html/dep/html/stormwater/wait_program.shtml
Search on the web page
- -use the right hand column, particularly the Harlem River Long Term Control Plan
- -and the Projects and Research tab
Links on our web page
http://www.bceq.org/wp-content/uploads/2018/10/Living-Shoreline_-Van-Cortlandt-Lake-4.pdf
http://www.bceq.org/wp-content/uploads/2018/10/20181019_CSO-LTCP_Citywide_LTCP_Mod_Request_002.pdf
Related Posts:
- » 2026-09-21_A Driving Range in Van Cortlandt Park? More like a Merry-Go-Round
- » Jane E.S. Sokolow Lecture Series: Lowering the Temperature with Nature
- » 2026-08-23_BCEQ-Policy_Brownfield-CleanUp-Program needs update
- » 2026-04-29_INVITE_BCEQ-Annual-Meeting with Program
- » 2026-02-28_Lowering-the-Temperature-with-Nature





Sorry, comments for this entry are closed at this time.